DTIC ADA052678: Quarterly Interim Technical Report (2nd), Contract DAAH01-75-C-0194.Report as inadecuate



 DTIC ADA052678: Quarterly Interim Technical Report (2nd), Contract DAAH01-75-C-0194.


DTIC ADA052678: Quarterly Interim Technical Report (2nd), Contract DAAH01-75-C-0194. - Download this document for free, or read online. Document in PDF available to download.

Download or read this book online for free in PDF: DTIC ADA052678: Quarterly Interim Technical Report (2nd), Contract DAAH01-75-C-0194.
BKD-s interim STINGER simulation activities have been associated with readying the hardware for data transmission between the major system components (i.e. SDS-9300 to AD-4 and SDS-9300 to GE-3010). During the quarter, IRSS interface operation was intermittent. Extensive testing was done to discover the source of errors generated in data exchanges.

Author: Defense Technical Information Center

Source: https://archive.org/



DOWNLOAD PDF




Related documents