Production rate comparison using different Load-Haul-Dump fleet configurations: Case study from Kiirunavaara MineReport as inadecuate




Production rate comparison using different Load-Haul-Dump fleet configurations: Case study from Kiirunavaara Mine - Download this document for free, or read online. Document in PDF available to download.

Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering.Salama, Abubakary Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering.Greberg, Jenny Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering.Schunnesson, Håkan Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering. 2015 (English)Conference paper, Presentation (Refereed)

Place, publisher, year, edition, pages: 2015.

National Category : Other Civil Engineering

Research subject: Mining and Rock Engineering

Identifiers: URN: urn:nbn:se:ltu:diva-35739Local ID: a65eb3c2-34cd-4444-8620-a0d349116704OAI: oai:DiVA.org:ltu-35739DiVA: diva2:1008993

Conference: Mine Planning and Equipment Selection : 08/11/2015 - 13/11/2015

Note: Godkänd; 2015; 20151001 (barska)Available from: 2016-09-30 Created: 2016-09-30Bibliographically approved



Author: Skawina, Bartlomiej

Source: http://ltu.diva-portal.org/



DOWNLOAD PDF




Related documents